ALL-WEATHER SAILING LOGBOOK (A5 FORMAT)
Ever come back from a fantastic sailing trip only to realize your logbook is a soggy mess? Standard sailing logbooks just can't handle the splashes and spray that come with a day on the water. The Backstay All-Weather Sailing Logbook (A5 Format) is different! With its durable, waterproof cover and all-weather paper, this boating logbook is built to endure the elements, so you can focus on enjoying the ride. And it's not just tough, it's packed with everything you need for a smooth cruise, from trip planners and maintenance logs to handy reference guides and boating checklists. Ditch the stress of a ruined ship's log and upgrade to the Backstay All-Weather Logbook (A5 Format) – the perfect companion for worry-free sailing adventures.
Backstay
All-Weather Sailing Logbook (A5 Format)
All-Weather Sailing Logbook (A5 Format)
Couldn't load pickup availability
Choose Backstay All-Weather Logbook (A5 Format) for Ultimate Durability! Built to withstand the elements, this logbook features a waterproof cover and all-weather paper, ensuring your records stay safe no matter the conditions.
The compact 6” x 9” size makes it the perfect companion for any boating adventure. Designed for both sailboats and powerboats, this all-in-one weatherproof sailing logbook keeps you fully prepared with:
- An easy-to-use reference guide with navigation rules
- International code flags and distress call scripts
- Sailing trip and project planners
- Boat maintenance logs
- Pre-departure and arrival checklists for safety and peace of mind
Crafted with attention to detail, the Backstay All-weather Logbook features quality all-weather paper and thoughtful touches like rounded corners for added protection.
Don't settle for an ordinary sailing logbook – upgrade to the Backstay All-weather Logbook and elevate your sailing cruising experience today.
Features
Features
- Perfect for sailboats and powerboats of all sizes navigating coastal waters.
- Size: 6 x 9 in. Convenient and compact sailing and boating logbook to hold and write on.
- Page Count: 96 pages of all-weather paper.
- Created to withstand the elements: waterproof cover and all-weather paper.
- Additional logs to keep everything in one place: Trip Planner, Project Planner, Maintenance Log, Fuel Log, Pumpout Log, Safety Equipment.
- Designed and printed in the USA.
Share

WHAT SETS IT APART
-
BUILT FOR DURABILITY
Forget ruined notes! This logbook features a waterproof cover and all-weather paper, ensuring your records stay safe from splashes, downpours, and even rogue waves.
-
ALL-IN-ONE ORGANIZATION
This all-in-one logbook streamlines your record-keeping and trip planning. It includes essential navigation references, trip planning sections, project trackers, and boating checklists.
-
SEAWORTHY DESIGN
Rounded corners offer protection from bumps and scrapes, while high-quality paper ensures clear writing throughout your journey, keeping your records organized and reliable.
ALL-WEATHER LOGBOOKS DIFFERENCE
he All-Weather Logbooks are available in two sizes: letter-size (8.5” x 11”) and A5 (6” x 9”). While both versions share similar content, there are a few key differences. Explore the details to find the best fit for your needs.
The sizes of
ALL-WEATHER LOGBOOKS
We offer All-Weather Logbooks in two sizes: letter-size (8.5” x 11”) and A5 (6” x 9”).
The difference
CHECKLISTS
Both sizes include pre-departure and arrival checklists. The key difference is that the letter-size logbook features reusable checklists for use with a dry-erase marker, while the A5 checklists serve as a guide. A5 format is shown on the photo.
The difference
DAILY LOG
The A5 format spans two pages, providing more space for notes, while the letter-size format features the daily log on a single page. Letter-size format is shown on the photo.
INTERESTED IN THE LARGER FORMAT?
WHAT'S INSIDE
-
SAILING LOG
68 all-weather sailing log spreads have all you need to prepare for departure and record details of your passage.
-
6 ADDITIONAL LOGS
Keep track of your boat with ease - maintenance log, pumpout log, refueling log, trip and project planners, and more.
-
CHECKLISTS
Sailing checklists for pre-departure and arrival to remind you or your crew of important tasks. Use them as a guide to keep everyone safe.
-
REFERENCE GUIDE
The guide has vital information for coastal cruising, such as navigation rules, distress call scripts, and more.
LOGBOOK IN DETAILS
KEY FEATURES
- Perfect for sailboats and powerboats of all sizes navigating coastal waters.
- Size: 6 x 9 in. Convenient and compact sailing and boating logbook to hold and write on.
- Page Count: 96 pages of all-weather paper.
- Created to withstand the elements: waterproof cover and all-weather paper.
- Additional logs to keep everything in one place: Trip Planner, Project Planner, Maintenance Log, Fuel Log, Pumpout Log, Safety Equipment.
- Designed and printed in the USA.
GOES BEYOND THE BASICS
This is more than just a logbook; it's a comprehensive boating management system. In addition to voyage tracking, it features dedicated sections for maintenance logs, pumpout and refueling records, safety equipment checklist, and even project and trip planning. Keep all your essential boat information organized and easily accessible in one place.
-
MAINTENANCE LOG
Don't let boat projects fall through the cracks! This logbook features a dedicated Maintenance Log, keeping everything in one place for smooth sailing and a well-maintained vessel.
-
FUEL LOG
Gain valuable data on your boat's fuel consumption. The Fuel Log lets you effortlessly track usage and costs. This information empowers you to optimize your cruising strategy and potentially reduce fuel expenses.
-
PUMPOUT LOG
This logbook simplifies environmentally responsible boating. Effortlessly track pump-out dates and volume, ensuring you comply with regulations and protect our waterways.
-
SAFETY EQUIPMENT
Peace of mind comes standard. The dedicated Safety Equipment Checklist helps you manage and document your essential gear, promoting regular inspections for everyone's safety on board.
-
PROJECT PLANNER
Stay on top of everything, from routine maintenance to dream projects, with the included Project Planner. This handy tool helps you organize and prioritize tasks, keeping your boat in top shape.
-
TRIP PLANNER
Maximize the excitement of every trip with the Trip Planner. This feature helps you plan and organize your sailing adventures and races, adding another layer of thrill to your time on the water.
TESTED AND CONTINUOUSLY IMPROVED
Backstay Sailing Logbooks are designed to last longer. They are tested in the rain, sun, and ocean spray offshore and throughout the Pacific Northwest.
TRUSTED COMPANION
The reference guide is crafted to aid you in the difficult situations when seconds count. Whether it is remembering how to issue a Mayday call, replying to a sound signal in a fog, or knowing what to do when you see a whale.
ONE PERCENT FOR THE OCEAN
We commit one percent of our profits to support ocean research, clean up, and marine mammal rehabilitation. Your purchase helps protect the richest ecosystem on earth.
YOU MAY ALSO LIKE
-
All-Weather Logbook
Regular price $69.95 USDRegular priceUnit price / perSale price $69.95 USD -
Single Engine Maintenance Logbook
Regular price $59.95 USDRegular priceUnit price / perSale price $59.95 USD -
Mayday Distress Call (VHF) Reference Card
Regular price $15.95 USDRegular priceUnit price / perSale price $15.95 USD